Mühlegasse 5 – Opfikon
Opfikon (ZH), CH

Mühlegasse 5 – Opfikon

Residential and commercial · 3 apartments

For the building at Mühlegasse 5 in Opfikon (ZH), comprising three apartments and a commercial area, a Separatus geothermal probe system was planned and selected to replace the existing oil heating system. Seven boreholes were drilled, each 135 m deep and 110 mm in diameter. Groundwater limited the maximum drilling depth to 140 m. The new heat pump has a heating capacity of 33 kW and a cooling capacity of 26 kW. The commercial use and associated longer operating hours were taken into account when determining the required total borehole length. The consultancy covered technical sizing and supervision of all works, including connection to the manifold. The reference report states that the Separatus probe delivers 15% higher performance than a conventional duplex geothermal probe.

Zürich, CH•2024

Multi-family building Zurich-West

Residential · 22 units

6 Separatus probes at 320m each. 30% investment savings vs. double-U. Annual average COP 4.6.

Madrid, ES•2024

Office building Madrid Centro

Commercial · 4,200 m²

8 probes at 380m beneath the inner courtyard. Heating + cooling. First installation of its kind in central Madrid.

Lugano, CH•2023

Single-family home Ticino

Residential · new build

2 probes at 250m in difficult rock subsoil. Full support from geology to commissioning.

Girona, ES•2023

Hotel Costa Brava

Hospitality · 86 rooms

12 probes at 300m. Heating, cooling and DHW for a complete hotel — powered by geothermal energy.

Bern, CH•2022

School building Bern-Mitte

Public sector · retrofit

Retrofit with 5 Separatus probes. The smaller footprint fit perfectly within the existing school grounds.

Logroño, ES•2022

Bodega Rioja

Industry · winery

Constant temperatures for the winery. 4 probes at 350m provide year-round heating and cooling.

What clients say

“CONSULTORIAS DE GEOTERMIA ADAL G, S.L. accompanied our project from the first geological study to commissioning. The investment came in 28% below our original budget — and the COP has been above plan for two years.”

M. BergerConstruction lead, MFH · Zürich

“In central Madrid we had very little space. With the Separatus System we were able to fit the entire installation under the inner courtyard. CONSULTORIAS DE GEOTERMIA ADAL G, S.L. coordinated permits, drilling and heat pump perfectly.”

C. FernándezOffice building owner · Madrid